CHURCH HALL

The parish hall was constructed in 1993 to provide a heated gathering site with a toilet facility and a kitchen. 

In 2017, the roof was 24 years old and was resurfaced with wood shingles to match that of the newly shingled church.  The windows were refinished on the interior and the exterior decorative was accented with a complementary color. 

An air conditioning system will be installed in the forced air system to prevent mold and mildew problems; problems that have occurred in the past.